DeskGo

Project: Office and Breakout Space Refurbishment
Location: Peterborough, Cambridgeshire
Size: 580 m2
Service provided: Fit Out Works
Project Manager: Chris Woosnam
Timescale: 12 weeks
The Braymere Road redevelopment project in Hampton, Peterborough, aimed to transform an existing site into a modern and functional space. This initiative responded to the need for upgraded facilities that met current standards of efficiency, safety, and aesthetic appeal. The project was driven by a commitment to enhance user experience and operational effectiveness within the premises.

Objectives

The primary objective of the project was to execute comprehensive refurbishments and installations that aligned with the client’s vision and operational requirements. The goal was to enhance structural integrity and functionality through targeted renovations, implementing modern amenities and technologies to improve user comfort and operational efficiency. Additionally, creating a visually appealing and cohesive environment that supported the site’s intended functions was paramount.

Scope of Works

The scope of works encompassed a range of activities aimed at enhancing the site’s overall functionality and aesthetics. Structural enhancements included assessing and reinforcing existing structures, creating new openings, and improving accessibility features. Internal fit-outs involved installing partitions, ceilings, flooring, and bespoke joinery to enhance interior aesthetics and functionality. Specialized installations encompassed fitting out kitchen units, sanitary ware, and custom features such as acoustic treatments and lighting solutions. External works focused on constructing outdoor amenities like bike sheds and patios, integrating landscaping for a cohesive external environment. Systems installations involved implementing HVAC systems, electrical wiring, data cabling, and plumbing services to support operational needs.

Challenges

The project faced several challenges that required careful management and strategic planning. Logistical coordination was crucial to managing multiple contractors and ensuring the seamless integration of various trades. Compliance with stringent building codes, health and safety standards, and environmental regulations throughout the project was essential to meet legal requirements and ensure sustainability. Time constraints posed another challenge, requiring meticulous scheduling and efficient resource allocation to meet deadlines while maintaining quality standards and minimizing disruptions to ongoing operations.

Outcomes

Upon completion, the project achieved significant outcomes that contributed to the overall success and satisfaction of stakeholders. Enhanced facility functionality was achieved through an improved layout and amenities that supported operational efficiency and user satisfaction. Modern aesthetic appeal transformed the environment with a refreshed interior and exterior design that aligned with contemporary principles. Compliance and safety were ensured through adherence to all relevant regulations and standards, providing a safe and sustainable facility for all users. Ultimately, client satisfaction was a key measure of success, with the project meeting or exceeding expectations regarding quality, budget, and timeline.

Conclusion

In conclusion, the redevelopment of Braymere Road in Hampton represented a strategic initiative to revitalize existing infrastructure and create a more functional and attractive environment. By addressing key objectives, managing challenges effectively, and delivering measurable outcomes, the project successfully achieved its goals. The team was dedicated to ensuring that all aspects of the redevelopment aligned with the client’s vision and contributed positively to the community.