Objectives
The primary objectives of the project were to strip out and renovate the existing reception area, upgrade infrastructure where necessary, and integrate new design elements to improve functionality and appearance. The focus was on creating a more spacious and inviting entrance that reflects the company’s ethos and provides a positive first impression to visitors.
Scope of Works
The scope of works included comprehensive tasks such as:
Internal Strip Out: The project began with the safe removal and disposal of existing electrical cabling and lighting installations, followed by the dismantling of the suspended ceiling system. This phase ensured a clean slate for subsequent renovations.
Structural Adjustments: A corner section of brickwork, including an external glass door set, was removed to facilitate the installation of a new glass curtain wall. The structural changes were carefully executed to enhance natural light and openness in the reception area.
Installation of Glass Curtain Wall: An 8-meter double-glazed glass curtain wall with powered auto double door set was installed to modernize and open up the entrance, complemented by making good to the surrounding brickwork for a seamless finish.
Ceiling and Partitioning: New suspended ceiling systems were installed in designated areas, while partitions were erected to delineate spaces like the post room. These improvements aimed to optimize the use of space and enhance acoustic insulation.
Air Conditioning and Electrical Adjustments: The existing air conditioning system was repositioned to accommodate the new layout, with adjustments made to electrical installations, including relocating power supplies and switches to better suit the updated floor plan.
Decorative and Functional Enhancements: Extensive preparations were made to walls, followed by the application of multiple coats of vinyl matt emulsion for a fresh appearance. A new reception desk with integrated LED lighting, matching wall and ceiling finishes, and installed manifestations and graphics further enriched the aesthetic appeal.
Challenges
Throughout the project, challenges such as coordinating structural modifications without disrupting daily operations, ensuring compliance with building regulations, and addressing unforeseen technical requirements posed logistical and operational challenges. However, proactive planning and effective communication mitigated these challenges, ensuring minimal disruption and adherence to project timelines.
Outcomes
The successful completion of the reception refurbishment project resulted in a transformed space that exceeded client expectations. The new reception area now boasts a modern, welcoming atmosphere that aligns with the company’s brand identity. Enhanced functionality, improved lighting, and upgraded facilities contribute to a more efficient operational environment. Positive feedback from staff and visitors underscores the project’s success in meeting its objectives of revitalizing the reception area into a contemporary and functional space.
Other projects you may like

The project focused on refurbishing the washroom facilities at a primary school to enhance functionality, hygiene standards, and accessibility for both students and staff.
Peter Smith Associates

The Diocese was relocating to a new purpose built facility on the outskirts of Ely and needed a fitout solution to complement their new training centre.
Diocese of Ely

The project involved a comprehensive refit of the WC facilities in a warehouse building to modernise and upgrade the existing amenities.
Acushnet Europe Limited

Thorpe Wood House is a large office complex in Peterborough. It is the East of England office for Anglian Water, a water company that supplies water and wastewater services to over 3.2 million customers.
Thorpewood House